The schedule

How long does pew reupholstery take?

The honest answer is a range, and the range depends on three things: how many feet of pew, how much of each pew is being done, and whether the wood is being touched at the same time.

A typical sanctuary of 30 to 50 pews takes one to two weeks to reupholster. Seats only runs at the fast end; seats, backs and kneelers at the slow end.

Add refinishing and the job runs two to four weeks for a refresh or refinish, three to six for full restoration. The room stays in use for every one of those Sundays.

Oak pew seat meeting the pew end at a tight joint
Half the room at a time. The other half stays in service.

What sets the pace

Reupholstery is measured in linear feet. A crew of two strips, re-foams and re-covers roughly 60 to 90 feet of seat per day when the pews are in reasonable shape. A 40-pew room at 14 feet per pew is about 560 feet, so seats alone is a week; seats and backs is closer to two, because backs are slower — more shaping, more edges, more places for a seam to show.

Kneelers add about a third again. They are small, but each one has hinges and a mechanism, and they are usually the most worn-out thing in the building.

What makes a job run long

How the week is built

We work half the sanctuary at a time. Monday the first section comes apart; by Friday afternoon it is finished and back in service. The second half starts the following Monday. Services, weddings and funerals all continue, and if a funeral lands mid-week we stop, clear, and pick up after. That is the whole point of sectioning.

If you would rather have the room untouched for a season — Advent, Easter, a wedding — say so on the call and we will schedule around it. The quote is good for 90 days.

Refinishing alongside it

Refinishing and reupholstery are done in the same visit whenever both are needed, because the pews are already apart. A refresh (clean, scuff, recoat) adds a few days. A full refinish (strip to bare wood) adds one to two weeks. Restoration, where structural repairs and new parts are milled, is the only level that runs past a month, and it is the level most churches do not need.

Curing is not the same as dry. A finish is touchable in hours and service-ready in a day, but it keeps hardening for a week. We tell you the difference, because most companies do not, and that is when the first scratch happens.

Questions we get asked

Before you call anyone.

Can the church stay open during the work?

Yes. Half the room is worked at a time and the other half stays seated and usable. We have not yet needed a church to cancel a service.

How much notice do you need?

Two to six weeks for stock fabric, longer if a custom color has to be milled. Book the week first; we will tell you the fabric date before you commit.

Do you work weekends?

Saturdays when a job needs it. Never Sundays, and every section is service-ready by 6 a.m. Sunday or that week's labor is free.

What if you find something worse than expected?

We stop, photograph it, and call you with a price before touching it. Nothing gets added to the invoice that you did not approve first.

Want a date, not a range?

Four photos and a pew count by email gets you a written range and the earliest week we could start.